Text generated by artificial intelligence, according to the Method.
What was corrected, and what changed
Correcting in silence is the cheapest way of lying.
The policy
An entry in the register holds the previous value, the new value, the date, the reason and the ledger row that changed. Nothing is removed: a corrected entry is added to that row’s history, it does not replace it. There are three kinds, and they are not mixed:
- Correction. The published value was wrong. It is a confession, and it is the reason the register exists.
- Update. The value was right and stopped being so, because what it measures changed. It is not an error.
- Provenance revision. The value did not change; the route to the source did, an address for example. It is neither an error nor an update.
Anyone who finds an error writes to correcoes@oestadodopais.pt. A confirmed error enters the register with credit to whoever found it, if they wish.
Anyone named may reply to the same address as the corrections: the reply is published beside the piece, unedited.
Write a correction
To say what you looked for and did not find, or which study you would like to read, the door is another one: the suggestions page.
Write here and the button opens your own mail program with the text already in it. Nothing is sent from this site: the message leaves from you, so you keep a copy of it.
If the button opens nothing, your computer has no mail program set up. In that case copy the address above and write from wherever you normally write.
The register
The changes, by date
7row · O Estado do País corrections published
- Portugal
Nominal unit labour cost per hour worked
17,7→ 17,9 three-year change, %source · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 28.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
custo-unitario-do-trabalho-2024 - European Union
Gross domestic expenditure on research and development (R&D)
2,24→ 2,26 % of GDPsource · EurostatEurostat revised the EU value on 29.09.2026 (the dataset stamp moved from 18.03.2026 to 29.09.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
despesa-em-id-2024-ue - Portugal
Gross fixed capital formation at current prices
20,4→ 20,5 % of GDPsource · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 28.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
formacao-bruta-de-capital-fixo-2024 - Portugal
Investment in durable goods used for production (gross fixed capital formation)
20,7→ 21,0 % of GDPsource · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 28.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
formacao-bruta-de-capital-fixo-2025 - Portugal
Real GDP per capita
20 430→ 20 520 euro per capita · chain linked volumes (2015)source · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 28.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
pib-real-per-capita-2024 - Portugal
Real GDP per capita
20 600→ 20 700 euro per capita · chain linked volumes (2015)source · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 28.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
pib-real-per-capita-2025 - Portugal
Net international investment position - annual data
−58,9→ −58,3 % of GDPsource · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 11.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
posicao-de-investimento-internacional-2024 - Portugal
What the country owns abroad minus what it owes (net international investment position)
−50,2→ −49,6 % of GDPsource · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 11.09.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
posicao-de-investimento-internacional-2025 - Portugal
Current account balance - 3 year average
0,3→ 0,4 % of GDP (three-year average)source · EurostatEurostat revised Portugal's value on 02.10.2026 (the dataset stamp moved from 08.07.2026 to 02.10.2026); the weekly check of 05.10.2026 caught the revision.
update Claim:
saldo-da-balanca-corrente-2024 - O Estado do País
Published corrections
5→ 7 correctionsrow · O Estado do PaísTwo corrections published on 02.10.2026 restore the decimal place of young people not in employment, education or training and of the credit flow to corporations. The count now includes them; the recount is not an additional correction.
update Claim:
correcoes-publicadas - Portugal
Credit flow to (non-financial) companies
3→ 3,0 % of the stock at the end of the previous periodsource · EurostatThe presentation omitted the decimal place already preserved in the source excerpt: «3.0». That decimal place is restored in the Portuguese number format, without changing the quantity or claiming a source revision.
correction Claim:
fluxo-de-credito-as-empresas-2025 - Portugal
Young people not in employment, education or training
8→ 8,0 % of the populationsource · EurostatThe presentation omitted the decimal place already preserved in the source excerpt: «8.0». That decimal place is restored in the Portuguese number format, without changing the quantity or claiming a source revision.
correction Claim:
jovens-nem-2025 - Évora
Study published · Évora 2027, European Capital of Culture: what the bid promised, what the European panel wrote and the money in the official acts
- Évora
Study published · The accounts of the Câmara de Évora, 2010 to 2025: the budget, what was collected, the debt and the certification
- Évora
Study published · The economy of Évora and the public money that reaches the municipality outside the council
- Évora
Study published · Quem governou a Câmara de Évora, 2009 a 2025: as eleições, os executivos, os pelouros e as decisões
- O Estado do País
Published editions
18→ 25 editionsrow · O Estado do PaísThe seven editions of the four Évora studies published on 01.10.2026 entered the archive. The editions of the six studies of August and September 2026 that they succeed remain hosted and count in the archive.
update Claim:
edicoes-publicadas - Évora
Published studies about Évora
6→ 4 studiesrow · O Estado do PaísThe six Évora studies became four: «The accounts of the Câmara de Évora, 2010 to 2025», «Quem governou a Câmara de Évora, 2009 a 2025», «The economy of Évora and the public money that reaches the municipality outside the council» and «Évora 2027, European Capital of Culture» succeed the six of August and September, which stay hosted as dated editions. The count becomes that of the studies with no successor.
update Claim:
estudos-evora-publicados - O Estado do País
Published studies
13→ 17 studiesrow · O Estado do PaísThe four Évora studies published on 01.10.2026, which succeed the six of August and September 2026, entered the archive. The six remain hosted as dated editions and count in the archive.
update Claim:
estudos-publicados - O Estado do País
Published corrections
3→ 5 correctionsrow · O Estado do PaísTwo corrections published on 30.09.2026 restore the decimal place of unemployment in Portugal. The count now includes them; the recount is not an additional correction.
update Claim:
correcoes-publicadas - Portugal
Unemployment rate
6→ 6,0 % of the labour forcesource · EurostatThe source writes «6.0». The presentation now preserves the decimal place in the Portuguese number format, without changing the quantity or claiming a source revision.
correction Claim:
taxa-de-desemprego-2025 - Portugal
Unemployment rate
6→ 6,0 % of the labour forcesource · EurostatThe source writes «6.0». The presentation now preserves the decimal place in the Portuguese number format, without changing the quantity or claiming a source revision.
correction Claim:
taxa-de-desemprego-mip-2025 - European Union
Household debt
49,3→ 49,2 % of GDPsource · EurostatEurostat revised the EU value on 26.09.2026 (the dataset stamp moved from 19.09.2026 to 26.09.2026); the weekly check of 28.09.2026 caught the revision.
update Claim:
divida-das-familias-2025-ue - Portugal
In the study “Penalizações por Reforma Antecipada em Portugal”, the sentence explaining the multiple between the legal penalty with the sustainability factor and the neutral reduction made the calculation with the rounded value, and that calculation did not give the multiple the sentence announced; the sentence now makes the calculation with the value before rounding. A list of career brackets gained the word “anos” in two of them. No value in the study changed.
- Portugal
The INE revised public debt for 2025 to 89,2 % of GDPsource · INE in the second notification of 2026 under the excessive deficit procedure, still provisional; the reading of the country now gives both official readings, the INE’s and Eurostat’s, and the value in the Eurostat table changes on 21.10.2026.
- Portugal
Eurostat titles its table on young people not in employment, education or training with the 15 to 24 age group, while the series it publishes is the 15 to 29 one. The definitions of four measures now state the age group they measure, in both editions. No value changed.
- Portugal
Seven INE indicator names no longer appear beside the values, because they were not confirmed as the same measure; three of them belonged to other indicators. No value changed.
- Évora
Study published · Évora 2027: what was promised, what the panel wrote, and the money line by line
- Évora
Published studies about Évora
5→ 6 studiesrow · O Estado do País«Évora 2027: what was promised, what the panel wrote, and the money line by line» entered the archive, the sixth work whose subject is the municipality of Évora. It came from this project's research engine, with both editions, and puts side by side what the European Capital of Culture bid promised, what the expert panel wrote about it, and the money written into public acts.
update Claim:
estudos-evora-publicados - Portugal
Study published · Penalizações por Reforma Antecipada em Portugal
- Évora
Recovery and Resilience Plan (PRR) funds approved for Évora
167 366 755,84→ 167 372 755,84 eurossource · Estrutura de Missão Recuperar Portugal[a verificar] · a field not confirmed against the source, not a doubt about what is publishedThe PRR publisher replaces the file and archives nothing. This sum was recomputed over the 2026-08-19 snapshot (listagem-de-entidades-prr-20260819.xlsx); the previous one was over the 2026-08-17 snapshot (listagem-de-entidades-prr-20260817.xlsx). The old value was not wrong when it was published: it measured a different snapshot, and that one is no longer served.
update Claim:
evora-prr-aprovado-2026 - Évora
Share of approved funds already paid
50,61→ 51,95 % of the approved amountsource · calculatedThis row derives from two that were recomputed over the 2026-08-19 snapshot: the paid and the approved amounts attributed to the concelho. Both moved, and the share this row publishes moved with them. The previous one was over the 2026-08-17 snapshot.
update Claim:
evora-prr-execucao-2026 - Évora
Recovery and Resilience Plan (PRR) funds paid in Évora
84 699 317,63→ 86 944 668,69 eurossource · Estrutura de Missão Recuperar Portugal[a verificar]The PRR publisher replaces the file and archives nothing. This sum was recomputed over the 2026-08-19 snapshot (listagem-de-entidades-prr-20260819.xlsx); the previous one was over the 2026-08-17 snapshot (listagem-de-entidades-prr-20260817.xlsx). The old value was not wrong when it was published: it measured a different snapshot, and that one is no longer served.
update Claim:
evora-prr-pago-2026 - Évora
Approved funds in projects past their deadline
102 618 703,85→ 102 624 703,85 eurossource · Estrutura de Missão Recuperar Portugal[a verificar]The PRR publisher replaces the file and archives nothing. This sum was recomputed over the 2026-08-19 snapshot (listagem-de-entidades-prr-20260819.xlsx and listagem-de-projetos-prr-20260819.xlsx); the previous one was over the 2026-08-17 snapshot (listagem-de-entidades-prr-20260817.xlsx and listagem-de-projetos-prr-20260817.xlsx). The old value was not wrong when it was published: it measured a different snapshot, and that one is no longer served.
update Claim:
evora-prr-vencido-aprovado-2026 - Évora
Share of approved funds in projects past their deadline
61,31→ 61,32 % of the approved amountsource · calculatedThis row derives from two that were recomputed over the 2026-08-19 snapshot: the overdue approved money and all the approved money attributed to the concelho. Both moved, and the share this row publishes moved with them. The previous one was over the 2026-08-17 snapshot.
update Claim:
evora-prr-vencido-quota-2026 - Évora
Recovery and Resilience Plan (PRR) funds approved for Évora
166 639 411,36→ 167 366 755,84 eurossource · Estrutura de Missão Recuperar Portugal[a verificar]The PRR publisher replaces the file and archives nothing. This sum was recomputed over the 2026-08-17 snapshot (listagem-de-entidades-prr-20260817.xlsx); the previous one was over the 2026-08-03 snapshot (listagem-de-entidades-prr-20260803.xlsx). The old value was not wrong when it was published: it measured a different snapshot, and that one is no longer served.
update Claim:
evora-prr-aprovado-2026 - Évora
Share of approved funds already paid
50,36→ 50,61 % of the approved amountsource · calculatedThis row derives from two that were recomputed over the 2026-08-17 snapshot: the paid and the approved amounts attributed to the concelho. Both moved, and the share this row publishes moved with them. The previous one was over the 2026-08-03 snapshot.
update Claim:
evora-prr-execucao-2026 - Évora
Recovery and Resilience Plan (PRR) funds paid in Évora
83 912 476,83→ 84 699 317,63 eurossource · Estrutura de Missão Recuperar Portugal[a verificar]The PRR publisher replaces the file and archives nothing. This sum was recomputed over the 2026-08-17 snapshot (listagem-de-entidades-prr-20260817.xlsx); the previous one was over the 2026-08-03 snapshot (listagem-de-entidades-prr-20260803.xlsx). The old value was not wrong when it was published: it measured a different snapshot, and that one is no longer served.
update Claim:
evora-prr-pago-2026 - Évora
Approved funds in projects past their deadline
102 711 703,85→ 102 618 703,85 eurossource · Estrutura de Missão Recuperar Portugal[a verificar]The PRR publisher replaces the file and archives nothing. This sum was recomputed over the 2026-08-17 snapshot (listagem-de-entidades-prr-20260817.xlsx and listagem-de-projetos-prr-20260817.xlsx); the previous one was over the 2026-08-03 snapshot (listagem-de-entidades-prr-20260803.xlsx and listagem-de-projetos-prr-20260803.xlsx). The old value was not wrong when it was published: it measured a different snapshot, and that one is no longer served.
update Claim:
evora-prr-vencido-aprovado-2026 - Évora
Share of approved funds in projects past their deadline
61,64→ 61,31 % of the approved amountsource · calculatedThis row derives from two that were recomputed over the 2026-08-17 snapshot: the overdue approved money and all the approved money attributed to the concelho. Both moved, and the share this row publishes moved with them. The previous one was over the 2026-08-03 snapshot.
update Claim:
evora-prr-vencido-quota-2026 - Évora
Study published · Évora — Promised, Paid, Audited 2026
- Évora
Published studies about Évora
4→ 5 studiesrow · O Estado do País«Évora — Promised, Paid, Audited 2026» entered the archive, the fifth work whose subject is the municipality of Évora. It is the first that did not come from an artifact host: it was produced by this project’s research engine and crossed over as a file, with both editions.
update Claim:
estudos-evora-publicados - Alentejo
Gross domestic product per inhabitant in the Alentejo
78,3→ 78 index (EU-27 = 100)source · EurostatThe published value carried a decimal the source does not support. It was computed from the absolute purchasing-power-standard values; Eurostat publishes this index rounded to the unit: 78. The index is now published as the source publishes it.
correction Claim:
pib-pc-alentejo-2000 - Alentejo
Gross domestic product per inhabitant in the Alentejo
77,2→ 77 index (EU-27 = 100)source · EurostatThe published value carried a decimal the source does not support. It was computed from the absolute purchasing-power-standard values; Eurostat publishes this index rounded to the unit (77) and marks the 2024 value provisional. Publishing a tenth of a point on a number the source expects to revise asserted a precision that does not exist. The index is now published as the source publishes it.
correction Claim:
pib-pc-alentejo-2024 - Portugal
Study published · Água Não Faturada
- Alentejo
Study published · Alentejo & Algarve — Economy, Society, Strategy
- Portugal
Study published · Avaliação Económica Regional de Portugal 2026
- Portugal
Study published · Evolução de Portugal desde 1981
- Évora
Study published · Évora — Economia, Investidores, Portas Abertas 2026
- Évora
Study published · Évora — Budgeted, Paid, Owed 2025
- Évora
Study published · Évora — Os Pelouros, Quem Os Teve, O Que Fizeram
- Évora
Study published · Évora — Quinze Anos, Cinco Mandatos
- Portugal
Study published · Onde está a água?
- Portugal
Study published · Which Door Is Yours — public funding in Portugal, August 2026
- Évora
Published studies about Évora
3→ 4 studiesrow · O Estado do PaísNew study published on 2026-08-12: Os Pelouros, Quem Os Teve, O Que Fizeram
update Claim:
estudos-evora-publicados - Évora
Published studies about Évora
4→ 3 studiesrow · O Estado do PaísThe value 4 came from the colophon of the identity study, which counted the English edition of «Évora — Orçamentado, Pago, Devido 2025» as a study in its own right. Under the distinction between work and edition that the archive uses, there are three studies, one of them with an English edition.
correction Claim:
estudos-evora-publicados
Provenance revisions
The value did not change; the way to find it did: a source that moves address, for example. They are neither errors nor updates, and they are not listed one by one here: they come many at a time and would drown the corrections. Each row below leads to its own history, where the revision is written out in full.
72 provenance revisions
credito-malparado-2024source · Eurostatcredito-malparado-2025source · Eurostatcusto-unitario-do-trabalho-2024source · Eurostatcusto-unitario-do-trabalho-2025source · Eurostatdespesa-em-id-2024-uesource · Eurostatdivida-das-empresas-2024source · Eurostatdivida-das-empresas-2025source · Eurostatdivida-das-empresas-2025-uesource · Eurostatdivida-das-familias-2024source · Eurostatdivida-das-familias-2025source · Eurostatdivida-das-familias-2025-uesource · Eurostatevora-prr-aprovado-2026source · Estrutura de Missão Recuperar Portugal[a verificar]evora-prr-municipio-contratadosource · Estrutura de Missão Recuperar Portugalevora-prr-pago-2026source · Estrutura de Missão Recuperar Portugal[a verificar]evora-prr-universidade-contratadosource · Estrutura de Missão Recuperar Portugalevora-prr-vencido-aprovado-2026source · Estrutura de Missão Recuperar Portugal[a verificar]fluxo-de-credito-as-familias-2025-uesource · Eurostatformacao-bruta-de-capital-fixo-2024source · Eurostatformacao-bruta-de-capital-fixo-2025source · Eurostatlicencas-de-construcao-2024source · Eurostatlicencas-de-construcao-2025source · Eurostatmunicipios-acores-caop-2025source · Direção-Geral do Território (DGT)municipios-continente-caop-2025source · Direção-Geral do Território (DGT)municipios-madeira-caop-2025source · Direção-Geral do Território (DGT)municipios-portugal-caop-2025source · calculated · Direção-Geral do Território (DGT)pib-real-per-capita-2024source · Eurostatpib-real-per-capita-2025source · Eurostatposicao-de-investimento-internacional-2024source · Eurostatposicao-de-investimento-internacional-2025source · Eurostatsaldo-da-balanca-corrente-2024source · Eurostat